USA HEADQUARTERS / TRINIDAD AND TOBAGO

An integrated
investment platform.

Quarry → construction materials → post-mine real estate. Blue Diamond Quarries proposes to develop a limestone resource as the industrial anchor for a phased platform, with each stage subject to independent diligence and commercial validation.

◆ CAURITA ROAD · MARACAS VALLEY · ST. JOSEPH

A resource-led base.
A longer-term vision.

The investment concept is designed as a diversified revenue platform, not a quarry-only story.

The illustrative scenario combines quarry and aggregate sales with concrete blocks, ready-mix concrete, asphalt and paving. After the modeled 15-year extraction period, downstream plants may continue using purchased third-party feedstock. A 20-villa estate is modeled separately for Years 16–20, while an eco-tourism resort remains an optional case excluded from the core scenario.

Explore the four engines of value

Four engines of value.
Sequenced over time.

Industrial operations are modeled to overlap; residential and hospitality development are later-stage options requiring separate validation.

01

Quarry & Aggregates

Limestone extraction, processing and third-party sales. The model assumes a ramp-up in Years 1–2 and full modeled rate from Year 3, subject to engineering proof, resource validation and approvals.

INDUSTRIAL ANCHOR
02

Construction Materials

Concrete blocks / masonry units, ready-mix concrete, asphalt mix and road-paving contracts. Throughput and sales assumptions require plant quotes, testing, customer evidence and contracts.

VALUE-ADDED PRODUCTS
03

20 Luxury Villas

A modeled estate of 20 homes on five-net-acre parcels, with four sales per year in Years 16–20. Land area, pricing, construction costs and absorption need local validation.

PHASED REAL ESTATE OPTION
i

Optional resort: a potential nature-oriented hospitality concept is modeled separately and excluded from the core case until feasibility, site suitability, approvals and development costs are evidenced.

From raw material
to finished products.

The model seeks to convert suitable quarry materials into products for construction and infrastructure markets while counting only third-party sales as consolidated revenue.

Product quality, delivered economics and customer commitments must be validated before modeled volumes are relied upon.

01

Concrete Blocks & Masonry

Model reaches 3.0 million units per year by Year 3; specifications, price realization, capacity and buyer contracts remain to be proven.

02

Ready-Mix Concrete

Model reaches 75,000 m³ per year by Year 3. Grade, mix design, dispatch, delivery radius and working capital require review.

03

Asphalt & Road Paving

Model assumes 25,000 tonnes of external asphalt sales and paving work equivalent to 8 km per year from Year 3, subject to tenders, scope and plant pricing.

04

Post-Mine Feedstock

After quarry extraction ends, the model assumes downstream plants purchase limestone fines and aggregates from third parties. Supply, specification, transport and price risk remain.

ILLUSTRATIVE SCENARIO
TRINIDAD & TOBAGOProject base
POST-MINEIndustrial + real-estate options
A phased development concept

Scale of the opportunity.

◆US$1.183B — 20-year core gross sales scenario
◆US$48.0M — Year 3 core revenue scenario
◆US$239.5M — post-mine industrial sales, Years 16–20
◆US$175.6M — modeled sales for 20 villas

A documented resource base.
An independent valuation.

An RICS valuation of the quarry reserves, together with the modeled revenue path for the integrated platform.

HISTORICAL VALUATION · 2015TTD 520M≈ US$76.7M at 6.78 TTD/USD

Market-value opinion of the Blue Diamond quarry reserves by ECMC Ltd. (RICS Registered Valuer), effective 9 April 2015, using the income approach (discounted cash flow at a 9.56% discount rate).

365 acrestotal estate, about 13 parcels
100 / 65 acresquarry site / effective area after a 35-acre buffer
~152 mlimestone body thickness reported on site
369,000 yd³planned saleable volume per year, Years 3–19

Source: ECMC Ltd., Valuation Report, 14 August 2015. Prepared to establish an asking price for the quarry reserves. It does not value the downstream plants, villas, resort or the integrated platform, and does not replace a current title, reserve or permit review.

Modeled revenue path

Project yearCalendarCore external revenue
Year 12027US$26.15M
Year 32029US$48.04M
Year 152041US$60.92M
Year 162042US$72.95M
Year 202046US$90.61M

Year 3 revenue by line

BusinessYear 3 modelExternal sales
Quarry & aggregates~399,000 yd³US$12.46M
Concrete blocks3.0M unitsUS$4.37M
Ready-mix concrete75,000 m³US$14.83M
Asphalt mix25,000 tUS$3.90M
Road paving8 km equivalentUS$12.48M

Nominal, undiscounted gross third-party sales. Villa sales in Years 16–20 are finite rather than recurring; recurring industrial sales in Year 20 are approximately US$49.82M.

BLUE DIAMOND
QUARRIES

Discuss the opportunity.

Blue Diamond Quarries is seeking an anchor strategic investor and financing partners for a phased integrated industrial platform in Trinidad & Tobago. Investment size, equity participation, security, governance and return structure remain subject to diligence and negotiation.

USA Headquarters
Trinidad and Tobago

Investor Inquiries